Eminence
Lyric guide

Critical Path

Read Critical Path lyrics by Eminence on LyroVerse, with linked artist context and related song paths.

Eminence visibility2 visits Video on page
person Curated by Ethan Walker LyroVerse team
Reference snapshot

The page facts to cite before the commentary

Use this page for the lyric text, linked artist context, and any LyroVerse editor's note attached to the song. Listener comments remain user-generated and should not be treated as the primary source.

Page type: lyric reference Artist: Eminence Canonical path: /eminence/critical-path Related lyric paths: 6 Video embedded: yes
Lyrics

Critical Path

The lyric stays readable and compact here; the note and related paths sit nearby so you do not lose the song while looking for context.

I can get this odd feeling out of my mind

I can get this vison of disoder out of my head

We don’t know when our time on earth will end

I will breath until my dying day

This empty and sickning feeling won’t to go away

Nothing will deter me. I’ll walked down to hell

I rushed through the path

bullet shot out of hate

the feeling was so overwelming

I hated outside into the rain

This empty and sickning feeling won’t to go away

Nothing will deter me. I’ll walked down to hell

You can try to survive by yourself

You can try to deny by yourself

Now is time to wake up

No panic in the air

Quick answers

What this page can answer fast

Who performs "Critical Path"?

Eminence performs "Critical Path", and this lyric page sits inside the Eminence catalog on LyroVerse.

Are there related songs to explore after "Critical Path"?

Yes. The related section below points to Born To Be Wild and Changers with a short reason for opening each page next.

Where can I find more songs by Eminence?

Use the artist link near the top of the page or the related paths section below to keep moving through Eminence's lyric pages.

Song Room

Interpretations, questions, and corrections for this song

Interpretations, questions, memories, and correction notes live together here. The room stays noindex while the best insights are reviewed.

Open Song Room
0 followers Selected insights only surface after moderation
Listener comments

What people are saying

0 comments
Add a short interpretation or memory

A strong comment here is specific: the phrase you keep hearing, the mood you come back for, or the reason this song stays in rotation.

Sign in to post the first listener note. Reporting stays open to everyone.

No listener comments on Critical Path yet.